Are you planning a real estate project? With our many years of expertise, we support you in every phase of your project. We develop convincing concepts for residential, office and hotel projects,
conduct location, market and feasibility analyses, create building rights and manage your project from A-Z. We also know our way around listed projects. You will find our detailed range of services on this page.

Service spectrum

01
Location and market analysis

Location characteristics and market development require a thorough analysis. It creates the conditions for the precise definition of target groups, prices, quantities and absorption capacity. The viability and cost-effectiveness of every utilization concept depend on these framework conditions, and they determine the market opportunities of every project development.

In principle, the analysis must be clarified: What are the qualities of the location? What value does it have in view of market development and the competitive situation? Which uses can be considered for a project?

Instruments
  • Evaluation of macro/microlocation
  • Analysis of strengths and weaknesses as well as opportunities and risks
  • Benefit analysis
  • Market and price analysis
  • Competitive intelligence
  • Relative positioning
  • Target group analysis and definition
  • 02
    Project idea, concept, project image

    Ideally, the project idea provides the best possible answer to the respective framework conditions determined by the location and market analysis. It has to be immediately obvious, convincing and inspiring – it has to “ignite”.

    Only then can it serve as the basis for a concept that exploits all potential and meets the diverse requirements of the project.

    Design and planning guidelines are developed that positively influence the project image and carry the project idea through all phases and make it recognizable in the object.

    Instruments
  • User demand programs
  • Space programs
  • Development concepts
  • Inventory surveys
  • Revitalisation and re-use concepts
  • Definition of project image
  • Benchmarking
  • Planning competition
  • 03
    Feasibility study

    The development of a property is complex: it is influenced by a wide variety of factors, disciplines and stakeholders. If aspects are overlooked or criteria are incorrectly evaluated, this can have a very negative impact on the project result.

    The feasibility study clarifies whether the prerequisites for project success are met and serves as a sound basis for the investment decision. If this is positive, the feasibility study immediately delivers the targeted roadmap to project success for all parties involved.

    Instruments
  • Investment cost calculation
  • Cash flow analysis
  • Static and dynamic investment calculation
  • Complete financial planning/return on equity
  • Sensitivity analysis
  • Life cycle assessment
  • 04
    Building law enforcement

    Building law stipulations on the type and extent of use as well as on the area that can be built on provide the framework for the possibility of using and developing a plot of land and thus for the economic efficiency of a property.

    The most conclusive concept remains on paper if it cannot be approved. Therefore, it is necessary to clarify the legal building requirements already at the beginning of the project. If they are not sufficient, they must be developed for the project and contractually secured in order to be ready for approval quickly.

    Instruments
  • Development studies
  • Analysis of the building regulations
  • Clarification of the approval procedure
  • Clarification of exceptional circumstances/exemptions
  • Coordination with the public authorities
  • Neighbourhood agreements
  • Project-related development plans
  • Conception of urban development contracts
  • 05
    Master planning

    Urban development projects require sustainable, i.e. solid and at the same time flexible master planning. Often, they are implemented at certain time intervals, or changes occur that affect the project in terms of demand or target group, for example.

    The master plan must be designed in such a way that it can be adapted to such developments at any time. This ensures that the adjustments are not at the expense of the urban development and spatial quality and that the requirements of the target group are always the focus of attention.

    Instruments
  • Preliminary urban planning design
  • Framework planning
  • Step-by-step plan
  • Open space planning, traffic planning
  • Analysis of the subsoil conditions
  • Energy supply concepts
  • Concepts for media technology
  • Translation of master plan into development plan
  • 06
    Cultural protected objects

    The monumental character of an object has effects on use, building costs, building physics, tax treatment and many other aspects.

    Project development in a listed building can entail increased approval risks. These risks can be minimized through professional preparation, a sensitive approach and the appropriate negotiating skills with the responsible authorities. In this case, the unique selling proposition of the monument property can also provide an economic added value of the construction measures.

    Instruments
  • Substance tests
  • Historical building investigations
  • Coordination with monument authorities
  • Concepts for the preservation of historical monuments
  • Monument preservation plans
  • Design primers
  • Design statutes
  • Complementary concepts
  • Service-Development References

    Location and market analysis: Kronprinzenpalais

    The Kronprinzenpalais, owned by the Confederation, at the beginning of the Unter den Linden road was rebuilt after the war to plans by Richard Paulick. The task of the analysis was to identify utilization potentials suitable for the site and market and to develop a usage variant optimized in terms of cost-effectiveness, taking into account the preservation of monuments.

    Client:
    Bundesanstalt für Immobilienaufgaben (BImA)

    In cooperation with empirica

    Location and market analysis:
    Ministry building “House II”, Berlin-Mitte

    The heritage-protected Block II of the former Deutsche-Bank complex at Mauerstraße 25-28 is to be converted for federal ministerial purposes with multifunctional use. For the special use areas, property and location suitable use potentials had to be determined and linked to a sustainable use concept.

    Client:
    Bundesanstalt für Immobilienaufgaben (BImA)

    In cooperation with empirica

    Research Project:
    “Conversion of Non-residential Real Estate into Residential Real Estate”

    PROPOS is involved in the research project, which for the first time systematically analyses the conversion of office, commercial and industrial buildings into living space in Germany. The project is part of the research programme “Experimental Housing and Urban Development – ExWoSt” of the Federal Institute for Research on Building, Urban Affairs and Spatial Development (BBSR).

    Client:
    Federal Ministry of Transport, Building and Urban Affairs (BMVBS)

    In cooperation with empirica

    Master planning:
    Inselstadt Gartenfeld, Berlin-Spandau

    Not far from Spandauer Altstadt and Zitadelle lies the island Gartenfeld with orphaned industrial buildings of the Siemenswerke. The master plan envisages a business and technology park for the southern part of the almost 60-hectare site and a mixed area with around 3,000 apartments and an attractive infrastructure for the northern part.

    Press:
    Der Tagesspiegel, Berlin: Article from 16.09.2014

    Client:
    Illuminus Group Germany

    In cooperation with empirica

    Concept development, master planning and project management:
    Marina-Resort Heiligenhafen

    The Marina-Resort Heiligenhafen is located between the Baltic Sea, the marina, the nature reserve “Graswarder” and the newly developed southern beach of the lake. The concept envisages a total of 61 houses, 40 of which are holiday homes for individual use. The other 21 houses house holiday apartments and maritime businesses.

    Client:
    Primus Immobilien AG

    In cooperation with empirica

    Building Expert Report:
    Berlin-Tempelhof Airport

    Berlin’s historic Tempelhof Airport was closed in 2008. No final decision has yet been made on the subsequent use of the listed building complex. Since then, the halls and hangars have mainly been used for trade fairs and events. In the expert opinion, the building fabric was recorded and evaluated, possible uses examined (office use by federal authorities), initial investments and ongoing operating costs determined and the realisation period measured.

    Client:
    Federal Office for Building and Regional Planning

    Feasibility Study:
    Aerospace Museum at Berlin-Tempelhof Airport

    A space programme and an overall concept for an aerospace museum were drawn up in line with the requirements of a listed building, according to which the former check-in hall serves as the entrance area and the eastern halls as the exhibition area. An aerospace innovation centre, a conference centre and hotels are also planned for other parts of the building.

    Client:
    Federal Office for Building and Regional Planning

    Project development study:
    Use concept for the airport Berlin-Tempelhof

    An overall concept for all parts of the building complex was developed, comprising eight concept modules: Special airport (for private, business and public air traffic), health centre, hotel, congress centre, administration, museum, police and special uses. The concept leaves room for a gradual and flexible realisation of the modules.

    Client:
    CED Central European Development GmbH

    Feasibility study:
    Property Clayallee, Berlin-Zehlendorf

    On the basis of the analysis of suitable site and property uses for the former US headquarters in Dahlem (once the headquarters of the Air Force Command III), five different uses were developed and evaluated with regard to marketability: Use by authorities, barrier-free for all, hotel and conference, education and science, mixed use.

    Client:
    Federal Institute for Real Estate Affairs (BImA)

    In cooperation with empirica

    Feasibility study:
    Central State Library at Berlin-Tempelhof Airport

    The spatial and structural possibilities for accommodating the Central State Library (ZLB), which was divided into three locations, in main parts of the building complex had to be investigated. The most important goals were to expand the open access area and to provide visitors with suitable reading and working places as well as to bring the administrative apparatus together.

    Client:
    Tempelhof Projekt GmbH / Senate Department for Urban Development

    Project development study: Chancellery building of the monastery Neuzelle

    The 1286 founded, later baroque monastery Neuzelle in the Lower Lusatia was gradually renovated since the fall of the Wall. Much of the building is now used as a school and boarding school. For the refurbishment of the office building from the 18th century, different usage variants were examined and evaluated.

    Client:
    Foundation Stift Neuzelle